Arapahoe Combined Cycle Natural Gas Plant
CORE entered into a contract with the Arapahoe Combined Cycle natural gas plant for generation beginning in 2026. This 120-megawatt plant was originally built in 2000 and includes two gas turbines, a heat recovery steam generator and a steam turbine. The plant has historically met or exceeded its reliability targets and will back deliveries from weather-dependent resources like wind and solar. Over time, CORE expects to dispatch this plant less as more of our contracted renewable plants go online.
Spindle Hill Combustion Turbine Plant
The Spindle Hill Combustion Turbine Plant, operated by a subsidiary of Invenergy, is a 300-megawatt natural gas peaking plant that began operations in 2007. CORE will dispatch the plant to meet peak load needs and firm up renewables as of Spring 2027, after its existing power purchase agreement expires.
Canyon Peak Power
Canyon Peak Power is a 156-megawatt natural gas peaking plant built following completion of a long-term power purchase agreement with CORE. Engineered for flexibility, the plant is designed to respond quickly to changes on the power grid, ramping quickly to support high levels of renewable generation and enhance regional reliability. The facility began operating in the Summer of 2026.