Rooftop Solar

Colorado HB26-1007 requires new rules for meter collar adapters, which have not yet been finalized by the State of Colorado. CORE is awaiting final state guidance before establishing a program or approval process.

Once the rules are finalized, CORE will publish installation requirements, approved equipment, and application procedures on this page. Please check back for updates.

person installing solar panels on a roof

Nearly 9,000 CORE members have rooftop solar systems interconnected to our grid, representing more than 52 megawatts of potential power.

Considering a rooftop solar system of your own? Learn what you need to know about choosing a solar provider, connecting your system to CORE’s grid, and understanding how solar may affect your electric bill.

Please be aware of the following when choosing a solar provider or estimating bill impacts.

Choosing a Solar Provider

CORE does not require members to install rooftop solar or contract with any particular solar vendor.

We have received reports of door-to-door and other solar sales personnel falsely claiming affiliation with CORE. We have no exclusive or non-exclusive agreements with solar providers, do not have a preferred solar company, and have not authorized any solar contractor to speak on our behalf.

CORE does not and cannot prohibit solar providers from installing their products within our service territory.

Some sales and installation personnel have also incorrectly blamed CORE for their company’s decision not to operate within our service territory.

We accept all interconnection applications that meet the interconnection requirements.

When discussing potential savings or other benefits with a rooftop solar vendor, ask that calculations be based specifically on CORE’s rate structure.

Solar vendors often operate in multiple states with different interconnection policies and may not be familiar with CORE’s policies, procedures, or rate structure. If your vendor is unfamiliar with CORE’s requirements, contact us to discuss how installing rooftop solar may affect your monthly bill.

Net Metering & Solar Credits

Connecting Your Generation System

Looking to connect your system to CORE’s grid?

Interconnection Requirements & Applications

CORE accepts interconnection applications that meet the applicable requirements. Applications for interconnection and system requirements are outlined in the following documents. Review the requirements and applications below to determine what applies to your generation system.

Net Metering FAQs

Net metering is a billing arrangement that gives customers credit for the excess electricity sent to the power grid. Find out more about net metering with these frequently asked questions:

DG systems are small-scale, on-site power generating sources located at or near members’ homes or businesses.

Common examples include:

How DG connects to the grid
Members with these types of generation systems connect to the local electric grid and use the grid both to buy power from CORE during times when their DG systems are not producing enough to meet their needs and to sell power to CORE when their systems are producing more electricity than is needed.

Net metering is a billing function that allows members with DG resources to offset their energy usage by their DG output and effectively “sell” any excess electricity generated by their DG systems back to CORE at the retail rate.

The energy your interconnected renewable system generates directly offsets energy that CORE provides you on a kilowatt-hour-to-kilowatt-hour basis. If your system generates more energy than you consume, it is delivered to CORE’s distribution system. If, during a monthly billing period, the energy delivered to CORE exceeds the amount of energy delivered to you from CORE, that energy is credited and carried forward to offset use in future months. An annual “true-up” is performed each year within 60 days of the end of the April billing cycle, at which point CORE provides a bill credit or refund for any remaining excess generation accrued at CORE’s avoided cost of power, as calculated by CORE for the previous calendar year.

Avoided cost refers to the cost CORE can avoid by purchasing energy from a net-metered member.

Avoided cost can include

Expressed as a per-kilowatt-hour cost.

Current avoided cost

For more information on renewable energy, consider purchasing Renewable Energy Credits.

The net meter true-up rate is based on our actual avoided costs during calendar year 2024, per our tariffs.

2021

3.5x normal range

A CORE designer will contact you to discuss project requirements, provide an estimated cost range, and identify any additional requirements, such as surveys or easements.

2022

20% increase

High natural gas prices increased CORE’s energy rate from Xcel Energy by 20%. These costs were compounded by a roughly five-month outage of the Comanche Unit 3 coal plant.

2023

Prices normalized

Natural gas prices returned to historical norms, Comanche Unit 3 was available most of the year, and CORE continued to add solar resources at both the utility and retail scale.

2024

Capacity costs increased

The increase in the avoided cost rate was primarily attributable to higher capacity costs and changes in the timing of CORE’s wholesale billing determinants. Those factors increased the average rate despite a decrease in average wholesale energy prices.

2025

Replacement energy costs increased

Comanche Unit 3 was out of service during the latter part of the year, resulting in higher replacement energy costs. Distributed solar also provided lower capacity offsets as generation and transmission peaks shifted later in the day.