Covered buildings that have fewer than 4 utility customers/tenants will be required to obtain tenant consent prior to CORE releasing electric meter energy-usage data to the building owner.
- If your building has 4 or more tenants, this form is not required.
- For buildings with fewer than 4 tenants, please ensure that a signed copy of this form is uploaded for all tenants. It is the building owner’s responsibility to keep these documents updated and filed with CORE Electric Cooperative.
Note: If benchmarking data disclosure is covered within a lease agreement provision, a signed copy of the lease may be uploaded in lieu of the Authorization for Release of Utility Information Form.
Download Form (PDF)Upload completed forms in the tab below.