The proposed location for Monte Ridge Substation is ideal because it is adjacent to two existing 115-kilovolt transmission lines — one owned by CORE and the other by Xcel Energy.
The existing Castle Rock Substation site is less than 5 acres and cannot be expanded for the necessary equipment and infrastructure.