Most members in the area are currently served by CORE’s Castle Rock Substation, which provides approximately 50 megawatts (MW) but is already at near-maximum capacity. Castle Rock has approved construction of new single-family homes that would put the existing Castle Rock Substation well over its maximum capacity and create reliability issues.

Monte Ridge Substation will introduce 100 MW of additional capacity and take load off the Castle Rock Substation. It also will allow CORE to transfer load between the substations so that necessary maintenance can be performed on one or the other without interruption to members’ electric service.

The proposed BESS will allow CORE to store power during off-peak hours for distribution in periods in which demand is high, which helps members avoid additional fees during on-peak hours.