Expansion of the existing Plum Creek and Sedalia substations is not possible because of a lack of suitable and/or available land at either site. The proposed location for Timber Mill Substation is ideal because it is adjacent to an existing 115-kilovolt transmission line between the Plum Creek and Sedalia substations.