CORE’s current transmission and infrastructure projects are designed to maintain reliability, improve resiliency, support generation and storage resources, and accommodate expected system growth. Planned projects were not developed specifically for data center loads.
Large-load projects require extensive engineering reviews and feasibility studies. Utilities must ensure that sufficient transmission, substation and power supply resources exist before service can be provided. Depending on a project’s complexity, due diligence and planning can take many months.
These components are designed to reflect the cost of providing electric service and help ensure members pay based on their actual use and impact on the system.
CORE carefully evaluates all large-load requests to ensure reliability remains the top priority. Service is only provided if sufficient transmission, generation and distribution resources are available to maintain reliable service for all members.
The data center developer pays for infrastructure required to serve its project.
This may include substations, interconnection facilities, transmission upgrades and other dedicated equipment. These costs are assigned to the project and are not added to CORE’s general system costs for other members.
No. Data centers do not automatically increase electric rates.
CORE uses cost-based rates, meaning each member class pays their fair share based on the cost to serve them. Large-load customers, including data centers, are responsible for the costs associated with serving their facilities.